VOLTCHECK

Chevrolet Equinox EV: Charging

Pack

Model yearCapacityChemistry
2024Lithium-ion NCMA cathode, blended graphite anode
202685 kWh

DC fast charging

Model yearRate Chevrolet gives the carMiles added in 10 minutesCharge window
2024Standard DC fast-charging capability of up to 150 kWApproximately 70 mi / approximately 77 mi
2026150 kW public DC fast chargingFWD 84 mi; AWD 81 mi; AWD with 19 kW 76 mi10% to 80% in approximately 42 minutes
2027Up to 80 mi
Model yearFast Charge PrepTime to reach the optimal temperature
2024If equipped, adjusts the battery to the optimal temperature for quicker fast charging, and starts automatically when a fast-charge station is added to a Google Maps routeDepending on the outside and battery temperature, Fast Charge Prep could take longer to reach the optimal temperature
2025If equipped, adjusts the battery to the optimal temperature for quicker fast charging, and starts automatically when a fast-charge station is added to a Google Maps routeDepending on the outside and battery temperature, Fast Charge Prep could take longer to reach the optimal temperature
2026If equipped, adjusts the battery to the optimal temperature for quicker fast charging, and starts automatically when a fast-charge station is added to a Google Maps routeDepending on the outside and battery temperature, battery conditioning could take longer to reach the optimal temperature
2027If equipped, prepares the battery by ensuring it is at the optimal temperature to charge at a fast charger. Starts automatically when a DC station is added to a Google Maps route; otherwise start it from Charging in the infotainment screen about 30 minutes before chargingDepending on outside and battery temperatures, battery conditioning could take longer to reach the optimal temperature

Home charging (Level 2)

Model yearOnboard chargerMiles added per hour of chargingChevrolet document
202411.5 kW, standardUp to 34 mi / up to 36 miThe September 2022 reveal and the May 2024 release
202419.2 kW, available on 3RS eAWDUp to 51 miThe September 2022 reveal, which shows a preproduction model
202511.5 kW capable, standard2025 Specification Guide
202519 kW capable — order code K20, RS only, inside the ZL5 package, which also requires dual-motor all-wheel drive, Active Safety Package 3, the dual-panel panoramic sunroof and Convenience Package 22025 Specification Guide
202619 kW, on AWDchevrolet.com 2026 model page
  • The 19.2 kW figure requires a professionally installed 19.2 kW AC / 100A dedicated charge station, sold separately.
Model yearCharge cord specifications
202485–265 volts AC single phase/split phase, 45–66 Hz, max 32 amps; NEMA 5–15P cordset max 12 amps; NEMA 14–50P cordset max 32 amps
202585–265 volts AC single phase/split phase, 45–66 Hz, max 32 amps; NEMA 5–15P cordset max 12 amps; NEMA 14–50P cordset max 32 amps
202685–265 volts AC single phase/split phase, 45–66 Hz, max 32 amps; NEMA 5–15P cordset max 12 amps; NEMA 14–50P cordset max 32 amps
202785–265 volts AC single phase/split phase, 45–66 Hz, max 32 amps; NEMA 5–15P cordset max 12 amps; NEMA 14–50P cordset max 32 amps
Model yearDual Level Charge Cord
2025Order code PSC. Portable, 120-volt (1.4 kW) and 240-volt (7.7 kW), swappable NEMA 5-15 and NEMA 14-50 plugs, SAE J1772 vehicle connection

Connector and adapters

Model yearCharge port
2024Combined Charging System 1 (CCS1)
2025Combined Charging System 1 (CCS1)
2026Combined Charging System 1
2027North American Charging Standard (NACS), from the factory
ItemAnswer
Tesla Supercharger access, CCS1 carsA GM-approved NACS DC adapter, plus public charging set up in the myChevrolet app. Select generation 3 (V3) and beyond Superchargers are open to GM drivers
Adapter price and warranty$225 MSRP, 12-month limited warranty from the date of purchase
Tesla Level 2 chargersNot compatible. The NACS DC adapter is for Tesla Superchargers only
CCS stations, 2027 NACS-native carsA NACS-to-CCS adapter
Level 1 and Level 2 charging, 2027 NACS-native carsA J-1772 cable
Third-party adaptersDamage from an adapter GM did not sell, provide or approve is outside the vehicle warranty; GM discourages third-party adapters
2025 accessory adapterOrder code RYZ, NACS DC adapter for public use on NACS fast charging stations including Tesla Supercharger, IONNA, EVgo and others, for CCS native inlet vehicles

See it for yourself

Scope note

US Equinox EV, model years 2024 through 2027. Chevrolet's charging figures for model year 2025 come from its 2025 specification guide and its owner's manual; the trim, order-code and package conditions above are that guide's, and a guide for one model year does not describe another. Where two Chevrolet documents give different figures for the same model year, both are shown, and the Level 2 table names the document each figure comes from.